High Capacity Data Center in the Seattle Metropolitan area with 42.5 Megawatts of dedicated power onsite

Secure, Flexible, Reliable and Scalable Data Center That Leverages Green Technology for Exceptional Cost Savings

Next Generation West Coast Data Center

The South Hill Data Center is fully operational and ready to immediately install and power up servers. Conveniently located 33 minutes from SeaTac International airport, South Hill Data Center has been built to LEED Gold and Energy Star quality standards. South Hill Data Center offers many competitive advantages. Most importantly: clean power, low power cost and industry-leading energy efficiency.

The high capacity South Hill Data Center can immediately deliver up to 260 Watts per square foot of critical load to the 56,605 square feet of raised floor space completed and ready for occupancy. An additional 70,000 square feet with 17.5 Megawatts of dedicated power is also available and ready to fit for a build-to-suit, in the adjacent South Building.

These two enterprise data center facilities are located on a secure 92-acre campus. The onsite dual-fed substation has 42.5 Megawatts of dedicated available power expandable in 25 Megawatt increments and an industry-leading low PUE.

Available Now



Copyright ©2009-13 The Benaroya Company